Consultive Services

Chania

Some of the exciting things happening here at NETE as we grow and develop include several new services we are ready to offer to our customers;

  1. Complete Power System Studies including;
    • Protection Device Coordination
    • Medium Voltage Relay Settings
    • Short Circuit
    • ARC Flash
    • Power Flow Analysis
  2. SCADA/ Communications Systems
    • Complete System Integration including Design & Programming
    • PLC Integration & Programming
    • Cabinet Supply Including Assembly, Wiring & Testing
    • Networking & Monitoring of Switchgear Relays & Meters to Master System and HMI

Support and Documentation

NETE_ maintains a large assortment of electrical test equipment. All of which is calibrated on a regular basis and the accuracy is traceable to the National Institute of Standards and Technology. Certificates of Calibration are maintained on file. Below is a partial list of the basic equipment we maintain:

  • Single Phase and Three Phase Protective Relay Test Sets
  • Ground Fault Test Equipment
  • AC & DC Hi Potential Test Sets
  • VLF Test Sets
  • Megger Testers
  • Circuit Breaker Primary Current Injection Test Sets
  • Test Sets for the calibration of LV Circuit Breaker Trip Units Manufactured by GE, Cutler Hammer, Sq D, Siemens & ABB
  • Transformer Turns Ratio Test Sets
  • Ground Rod and Earth Ground System Test Sets
  • Digital Low Resistance Ohm meters (Ductors)
  • High Voltage Phasing Sets
  • Phase Angle Meters
  • Fluke Meters and Accessories
  • Power Recording Instruments and Meters
  • Signal Generators
  • Infrared Scanners

Referneces:

LIST OF TRANSPORTATION/LIGHT RAIL PROJECTS

  • MTS, San Diego, perform all site work & repairs, acceptance testing and commissioning.
  • LAMTA, Los Angeles Blue Line, perform all site work & repairs, acceptance testing and commissioning.
  • LAMTA, Los Angeles Red Line - 3 Month Project to perform switchgear modifications including adding transformer sectionalizers. Final testing and commissioning.
  • BART, Light Rail extension into San Francisco Airport - 2 year project including acceptance testing of traction power substations and all site repairs, testing and commissioning.
  • St Louis Light Rail Project - 3 months, assist in performing site acceptance testing and commissioning.
  • WAMTA, Light Rail Project - approx 2 yr , 25 Substations, perform all site work & repairs, acceptance testing and commissioning.
  • LAMTA, Los Angeles Gold Line, East Side Extension - 1 yr Project to perform all site repairs, acceptance testing and commissioning.
  • LAMTA Gold Line extensions, Foothill & Expo Lines, 17 Substations , perform all site work & repairs, acceptance testing and commissioning.
  • WMATA, ongoing work to perform repairs, acceptance testing and commissioning of traction power substations
  • LLRI, Long Island Rail Road, New York, perform all site work & repairs, acceptance testing and commissioning.
    • Solar and Wind
    • Industrial
    • Municipal
    • Military