Some of the exciting things happening here at NETE as we grow and develop include several new services we are ready to offer to our customers;
- Complete Power System Studies including;
- Protection Device Coordination
- Medium Voltage Relay Settings
- Short Circuit
- ARC Flash
- Power Flow Analysis
- SCADA/ Communications Systems
- Complete System Integration including Design & Programming
- PLC Integration & Programming
- Cabinet Supply Including Assembly, Wiring & Testing
- Networking & Monitoring of Switchgear Relays & Meters to Master System and HMI
Support and Documentation
NETE_ maintains a large assortment of electrical test equipment. All of which is calibrated on a regular basis and the accuracy is traceable to the National Institute of Standards and Technology. Certificates of Calibration are maintained on file. Below is a partial list of the basic equipment we maintain:
- Single Phase and Three Phase Protective Relay Test Sets
- Ground Fault Test Equipment
- AC & DC Hi Potential Test Sets
- VLF Test Sets
- Megger Testers
- Circuit Breaker Primary Current Injection Test Sets
- Test Sets for the calibration of LV Circuit Breaker Trip Units Manufactured by GE, Cutler Hammer, Sq D, Siemens & ABB
- Transformer Turns Ratio Test Sets
- Ground Rod and Earth Ground System Test Sets
- Digital Low Resistance Ohm meters (Ductors)
- High Voltage Phasing Sets
- Phase Angle Meters
- Fluke Meters and Accessories
- Power Recording Instruments and Meters
- Signal Generators
- Infrared Scanners
Referneces:
LIST OF TRANSPORTATION/LIGHT RAIL PROJECTS
- MTS, San Diego, perform all site work & repairs, acceptance testing and commissioning.
- LAMTA, Los Angeles Blue Line, perform all site work & repairs, acceptance testing and commissioning.
- LAMTA, Los Angeles Red Line - 3 Month Project to perform switchgear modifications including adding transformer sectionalizers. Final testing and commissioning.
- BART, Light Rail extension into San Francisco Airport - 2 year project including acceptance testing of traction power substations and all site repairs, testing and commissioning.
- St Louis Light Rail Project - 3 months, assist in performing site acceptance testing and commissioning.
- WAMTA, Light Rail Project - approx 2 yr , 25 Substations, perform all site work & repairs, acceptance testing and commissioning.
- LAMTA, Los Angeles Gold Line, East Side Extension - 1 yr Project to perform all site repairs, acceptance testing and commissioning.
- LAMTA Gold Line extensions, Foothill & Expo Lines, 17 Substations , perform all site work & repairs, acceptance testing and commissioning.
- WMATA, ongoing work to perform repairs, acceptance testing and commissioning of traction power substations
- LLRI, Long Island Rail Road, New York, perform all site work & repairs, acceptance testing and commissioning.
- Solar and Wind
- Industrial
- Municipal
- Military